Özel Durum Açıklaması (Genel)

12.06.2025 10:19

BERA

Grup Şirketleri Güneş Enerji Santrali Yatırımı

Özel Durum Açıklaması (Genel)

Özel Durum Açıklaması (Genel)
[CONSOLIDATION_METHOD_TITLE] [CONSOLIDATION_METHOD]
İlgili Şirketler
Related Companies
[]
İlgili Fonlar
Related Funds
[]
Türkçe
Turkish
İngilizce
English
oda_MaterialEventDisclosureGeneralAbstract|
Özel Durum Açıklaması (Genel)
Material Event Disclosure General
oda_UpdateAnnouncementFlag|
Yapılan Açıklama Güncelleme mi?
Update Notification Flag
Hayır (No)
Hayır (No)
oda_CorrectionAnnouncementFlag|
Yapılan Açıklama Düzeltme mi?
Correction Notification Flag
Hayır (No)
Hayır (No)
oda_DateOfThePreviousNotificationAboutTheSameSubject|
Konuya İlişkin Daha Önce Yapılan Açıklamanın Tarihi
Date Of The Previous Notification About The Same Subject
-
-
oda_DelayedAnnouncementFlag|
Yapılan Açıklama Ertelenmiş Bir Açıklama mı?
Postponed Notification Flag
Hayır (No)
Hayır (No)
oda_AnnouncementContentSection|
Bildirim İçeriği
Announcement Content
oda_ExplanationSection|
Açıklamalar
Explanations
oda_ExplanationTextBlock|
Grup Şirketlerimizden;
• Divapan Entegre Ağaç Panel Sanayi Ticaret A.Ş. tarafından Konya ili Meram ilçesi Karahüyük Mahallesi 27559 Ada 68 Parselde yer alan araziye 999 kWe gücünde Güneş Enerjisinden Elektrik Üretim Santralinin (GES) kurulumu için SYS Enerji San. ve Tic. A.Ş. ile 571.669,56 USD tutarında,
• MPG Makine Prodüksiyon Grubu Makine İmalat Sanayi ve Ticaret A.Ş. tarafından Konya ili Meram ilçesi Karahüyük Mahallesi 27559 Ada 66 Parselde yer alan araziye 400 kWe gücünde Güneş Enerjisinden Elektrik Üretim Santralinin (GES) kurulumu için SYS Enerji San. ve Tic. A.Ş. ile 208.551,42 USD tutarında kurulum anlaşmaları yapılmıştır. Projelerin 2025 Eylül Ayı içinde tamamlanarak üretime geçmesi hedeflenmektedir.

Kamuoyuna saygıyla duyurulur.
İşbu açıklama İngilizce olarak da yapılmış olup, açıklama metinlerinde herhangi bir farklılık olması durumunda Türkçe açıklama esas kabul edilecektir.
In line with our sustainability and renewable energy goals, the following agreements have been signed by our group companies:
  • Divapan Entegre Agaç Panel Sanayi Ticaret A.S. has signed an agreement with SYS Enerji Sanayi ve Ticaret A.S. for the installation of a 999 kWe capacity Solar Power Plant (SPP) on the land located in Konya Province, Meram District, Karahuyuk Neighborhood, Block 27559, Parcel 68. The contract value is USD 571,669.56
  • MPG Makine Produksiyon Grubu Makine İmalat Sanayi ve Ticaret AS. has signed an agreement with SYS Enerji Sanayi ve Ticaret A.S. for the installation of a 400 kWe capacity Solar Power Plant (SPP) on the land located in Konya Province, Meram District, Karahuyuk Neighborhood, Block 27559, Parcel 66. The contract value is USD 208,551.42

The completion and commissioning of both projects are planned for September 2025.


Respectfully announced to the public.
This statement has also been explained in Turkish, and in case of any differences in the explanation texts the Turkish explanation will be taken as basis.

https://www.kap.org.tr/Bildirim/1447943



11:029.299
Değişim :  -0,14% |  -13,19
Açılış :  9.312  
Önceki Kapanış :  9.312  
En Düşük
9.219
En Yüksek
9.335
imkb grafik
BIST En Aktif Hisseler11:02
INVEO 7,70 81.332.254 % 10,00  
GEDIK 12,32 90.993.000 % 10,00  
ICUGS 2,66 64.460.008 % 9,92  
ADESE 7,34 85.437.483 % 9,88  
LRSHO 5,45 97.776.725 % 9,88  
11:02 Alış Satış %  
Dolar 39,4211 39,4239 % 0,53  
Euro 45,6863 45,6974 % 0,94  
Sterlin 53,5972 53,8658 % 0,10  
Frank 48,5703 48,8138 % -0,11  
Riyal 10,5148 10,5675 % 0,03  
11:02 Alış Satış %  
Gümüş ONS 36,36 36,40 % 0,66  
Platin 1.240,43 1.247,98 % 0,66  
Paladyum 1.043,42 1.050,99 % 0,66  
Brent Pet. 73,59 73,59 % 0,66  
Altın Ons 3.415,32 3.415,71 % 0,66