KAP : TURCAS PETROL A.S. / TRCAS [] OZEL DURUM ACIKLAMASI (GENEL) 07.12.2015 15:51:52

07.12.2015 15:51
KAP : TURCAS PETROL A.S. / TRCAS [] OZEL DURUM ACIKLAMASI (GENEL) 07.12.2015 15:51:52



BU HABERIN KAP `IN SITESINDEKI ORJINAL HALI VE EKLI DOSYALARINI GOREBILMEK ICIN ASAGIDAKI LINK`I TIKLAYINIZ!
HTTP://WWW.KAP.GOV.TR/YAY/BILDIRIM/BILDIRIM.ASPX?ID=486844

KAP : TURCAS PETROL A.S. / TRCAS [] OZEL DURUM ACIKLAMASI (GENEL) 07.12.2015 15:51:52

OZEL DURUM ACIKLAMASI (GENEL)
---------------------------------------------------------------------------------------------


ORTAKLIGIN ADRESI : AHI EVRAN CADDESI NO:6 AKSOY PLAZA KAT:7 34398 MASLAK SARIYER ISTANBUL
TELEFON VE FAKS NUMARASI : TEL: 0 212 259 0000 / FAKS: 0 212 259 0018
E-POSTA ADRESI : TURCAS_INVESTORRELATIONS@TURCAS.COM.TR
ORTAKLIGIN YATIRIMCI/PAY SAHIPLERI ILE ILISKILER BIRIMININ TELEFON VE FAKS NUMARASI : TEL: 0212 259 00 00 (DAHILI: 1287) / FAKS: 0212 259 00 18
YAPILAN ACIKLAMA ERTELENMIS ACIKLAMA MI? : HAYIR
OZET BILGI : %46 ORANINDA DOLAYLI ISTIRAKIMIZ TURCAS BM KUYUCAK JEOTERMAL ELEKTRIK URETIM A.S.`NIN ON LISANS TADIL BASVURUSU HAKKINDA


---------------------------------------------------------------------------------------------
SIRKETIMIZ TARAFINDAN 30.12.2014 TARIHINDE YAPILAN OZEL DURUM ACIKLAMASI`NDA BELIRTILDIGI UZERE; %46 ORANINDA DOLAYLI ISTIRAKIMIZ TURCAS BM KUYUCAK JEOTERMAL ELEKTRIK URETIM A.S. (`TBK`), AYDIN ILI KUYUCAK ILCESINDE 13,2 MW KURULU GUCUNDE OLMASI PLANLANAN JEOTERMAL ELEKTRIK SANTRALI (JES) PROJESI ICIN ENERJI PIYASASI DUZENLEME KURUMU`NDAN ON LISANS ALMISTI.

BAHSI GECEN JES KURULU GUCUNUN 13,2 MW`DAN 18 MW`A YUKSELTILMESI AMACIYLA, 07.12.2015 TARIHINDE TBK TARAFINDAN ENERJI PIYASASI DUZENLEME KURUMU`NA ON LISANS TADIL BASVURUSUNDA BULUNULDUGU BILGISI SIRKETIMIZE ULASMISTIR.

KONU ILE ILGILI GELISMELER OLDUKCA, KAMUOYUNA GEREKLI BILGILENDIRME YAPILACAKTIR.

KAMUOYUNA SAYGIYLA DUYURULUR.

PLEASE FIND BELOW THE ENGLISH VERSION OF THE DISCLOSURE:

SUBJECT: ABOUT THE APPLICATION OF TURCAS BM KUYUCAK JEOTERMAL ELEKTRIK URETIM A.S. (OUR 46% INDIRECT SUBSIDIARY) REGARDING THE REVISION OF PRE-LICENSE

AS PREVIOUSLY ANNOUNCED IN OUR COMPANY`S PUBLIC DISCLOSURE DATED 30.12.2014, TURCAS BM KUYUCAK JEOTERMAL ELEKTRIK URETIM A.S. (`TBK`), OUR 46% INDIRECT SUBSIDIARY, HAD OBTAINED ELECTRICITY GENERATION PRE-LICENSE FROM ENERGY MARKET REGULATORY AUTHORITY (`EMRA`) REGARDING GEOTHERMAL ELECTRICITY POWER PLANT (GEPP) PROJECT PLANNED TO HAVE AN INSTALLED CAPACITY OF 13,2 MW IN AYDIN PROVINCE, KUYUCAK REGION.

OUR COMPANY HAS BEEN INFORMED THAT TBK HAS APPLIED TO EMRA ON 07.12.2015 FOR THE REVISION OF PRE-LICENSE IN ORDER TO INCREASE THE INSTALLED CAPACITY OF THE ABOVE MENTIONED GEPP FROM 13,2 MW TO 18 MW.

FURTHER DEVELOPMENTS WILL BE SHARED WITH THE PUBLIC ON A TIMELY BASIS.

KIND REGARDS,

NOTE: IN CASE OF A DISCREPANCY BETWEEN THE TURKISH AND THE ENGLISH VERSIONS, THE TURKISH VERSION SHALL PREVAIL.

---------------------------------------------------------------------------------------------




'
17:569.910
Değişim :  1,99% |  193,02
Açılış :  9.763  
Önceki Kapanış :  9.717  
En Düşük
9.751
En Yüksek
9.956
imkb grafik
BIST En Aktif Hisseler17:54
MEGAP 5,72 28.004.468 % 10,00  
MEGAP 5,72 28.004.468 % 10,00  
YGYO 8,25 17.002.788 % 10,00  
PKART 106,70 118.960.449 % 10,00  
AKMGY 363,00 72.357.672 % 10,00  
17:54 Alış Satış %  
Dolar 32,4706 32,4744 % -0,04  
Euro 34,7085 34,7188 % -0,72  
Sterlin 40,2147 40,4163 % -0,75  
Frank 35,2758 35,4527 % -0,62  
Riyal 8,5993 8,6424 % -0,39  
17:54 Alış Satış %  
Gümüş ONS 27,23 27,26 % 0,66  
Platin 915,66 917,13 % 0,66  
Paladyum 959,06 961,84 % 0,66  
Brent Pet. 88,87 88,87 % 0,66  
Altın Ons 2.334,07 2.334,42 % 0,66